Project Milestones and Industry Advances
Project Overview:
-
Capital Expenditure: $87M CAD
-
Client: Sayona Mining
-
Increase production to 3800 tpd open pit mine operation that treats pegmatite ore by froth flotation to produce chemical-grade 6% Li2O spodumene concentrate
Our Mandate:
-
Owner's Team Representative
-
Engineering Management
-
Project and Construction Management
-
Procurement and Contract Management
-
Risk Management
-
Pre-operational verification and commissioning service
-
Project delivered on time and on budget
Sayona NAL Complex Process and Capacity Improvements - 2020-2024

Project Overview:
-
Capital Expenditure: $26M CAD
-
New 5500t of crushed ore storage capacity
-
Including a by-pass system and a dust collection system with particulate emission control
Our Mandate:
-
Owner's Team Representative
-
Engineering Management
-
Project and Construction Management
-
Procurement and Contract Management
-
Pre-operational verification and commissioning service
-
Project delivered on time and on budget
Sayona Crushed Ore Storage Dome - 2023-2024

Project Overview:
-
Capital Expenditure: CAD 100 Million for two spillways
-
Inauguration: 1952-1953
-
Features: 6 Valves Each, CCD at 37.8m, CCS at 39.6m
-
Hydrological Impact: Critical and Substantial
Our Mandate:
-
Project Management and Oversight
-
Conducted Cost Estimates and Risk Assessments for OoM and PFS phases
-
Managed Procurement Coordination
-
Facilitated RTA Project Approval
-
Oversaw Subcontractor Bid Analysis and Selection
Rio Tinto Project Spillways - Valve Evaluation Studies - 2023-2024

Project Overview:
-
Capital Expenditure: CAD $65 Million
-
Structure Origin: Built in 1924
-
Focus: Concrete Repairs on Downstream Side of 11 Runners and 12 Pillars
-
Structure Height: 40.5 Meters
-
Hydrological Impact: Significant
Our Mandate:
-
Managed a CAD $65 Million restoration of a historic 1924 construction
-
Managed concrete repairs for critical infrastructure, including 11 runners and 12 pillars, standing 40.5 meters tall
-
Addressed significant hydrological consequences through meticulous project management
Rio Tinto CIM-Spillway 4 Study: Refurbishment Downstream Side 2023-2024

Project Overview:
-
Capital Expenditure: CAD $240 Million
-
Outcome: Increased Aluminum Billet Production to 202,000 Tons Per Year
-
Enhancements: New Furnaces, Casting Pit, Coolers, Handling, Inspection, Sawing, and Packaging Systems
Our Mandate:
-
Coordinated Engineering Efforts
-
Managed Drawing and Technical Documentation Approval Processes
-
Assisted in Machine Safety and 3D Model Design Review Meetings
Rio Tinto Centre de Billettes - Alma Exécution - 2023-2024

Project Overview:
-
Capital Expenditure: CAD $45 Million
-
Objective: Replace Railcar Fleet in the Saguenay Area
-
Inventory: 200 Alumina and 40 Calcinated Coke Railcars
-
Logistics: Enhancements at 10 Load/Unload Locations
Our Mandate:
-
Project Management and Oversight
-
Provided Cost Estimations for Order of Magnitude (OoM) and Definitive Feasibility Study (DFS)
-
Conducted Risk Assessments for OoM and DFS phases
-
Developed the Execution Plan
-
Managed Subcontractor Bid Analysis and Contract Awards
Rio Tinto - Railcars - Fleet Replacement Studies - 2023-2024

Project Overview:
-
Capital Expenditure: CAD $600 Million
-
Annual Production: 23,000 tons of Lithium Carbonate
-
Product Concentration: 6.0% Li₂O
-
Upgrades Required: Hydrometallurgical Area (including NaSO₄ crystallizer and tank addition) and Pyrometallurgical Area (enhancements to feed pre-heat, cooling system, ball mill, and furnace)
Our Mandate:
-
Acted as the Owner's Representative
-
Led Conversion plant scoping study and pre-feasibility study
-
Metallurgical test work management
-
Successfully delivered the study on time and within budget
Sayona Québec Inc. - NAL Conversion Plant Technical Study - 2022-2023

Project Overview:
-
Capital Expenditure: CAD $60 Million
-
Client: Investissement Québec
-
IPMT execution model
-
Underground mining
-
Gold processing facilities
Our Mandate:
-
Owner's technical representative
-
Advising, reviewing and ensuring the projects integrity is met for the management of the project
-
Driving habits, coordinating the tasks with team leaders
-
Ensuring industry best practices and lean principals were in place
Monarch Mining - Beaufort Mine and Beacon Mill Restart - 2021-2022

Project Overview:
-
Capital Expenditure: EUR 1.28 Billion
-
Client: Vulcan Energy Resources
-
Brine Extraction: Utilizing wells
-
Geothermal Plant: Converts brine heat into electricity
-
Direct Lithium Extraction (DLE) Plant Processes
Our Mandate:
-
Represented the Owner's Team
-
Managed and Controlled the Project Studies in PFS and DFS
-
Handled Document Control
-
Orchestrated Pilot Plants' Turnkey Package, including bid, award, and control with two firms
-
Ensured the study was delivered on time and within budget
Vulcan Energy Resources - Prefeasibility Study - 2021-2023

Project Overview:
-
Capital Expenditure: USD $1 Billion
-
Ecuador's First Large-Scale Underground Gold Mine
-
Annual Output: 310,000 Ounces over 15 Years
-
Infrastructure: 10km of Tunnels, 50km of Roads, 42km Electrical Transmission, and a Processing Plant
Our Mandate:
-
Served as the Owner’s Technical Advisor
-
Validated Monthly Project and Construction Progress evaluations against Budget and Schedule
-
Conducted Regular Site visits
-
Authorized Periodic Cost-to-Complete Certifications
Investor Consortium - Fruta Del Norte (Lundin Gold) - 2018-2020

Project Overview:
-
Capital Expenditure: CAD $110 Million
-
Client: CATL
-
Lithium Reserve: 21 Mt at 0.94% Li₂O
-
Daily Processing Capacity: 3,800 tons
-
Annual Spodumene Production: 190,000 tons at 5.8% Li₂O
Our Mandate:
-
Owner's Team Representative;
-
Engineering Management
-
Project and Construction Management;
-
Project delivered on time and on budget
North American Lithium - LAN Restart - 2016-2019